C.DA BAIONE · ZONA INDUSTRIALE · MONOPOLI (BA)
Ali6
Infrastructure

Steel Bridge AQP

Noicattaro (Bari)

The project

Steel Bridge AQP – project description

Lattice-girder steel bridge carrying a sewer pipeline across a gap, built as part of the upgrade and extension of the urban sewer network. The structure rests on concrete piers and abutments and carries the pipe between the two lattice girders.

Ali6 handled the detailed design with the structural calculations, the workshop fabrication, transport and installation on site. The lattice spans are built and welded in the workshop, then lifted by mobile cranes and set on the piers.

Main features:

  • Steel work in hot-rolled sections (IPE, HEA, HEB, HEM, UPN series, angles and flats)
  • Connection and stiffening plates, flanges, bolting and welding
  • Execution class EXC3
  • Detailed design and structural calculations
  • Transport and installation on site

The installation on video

Lifting the span The lattice span is lifted by the mobile cranes and carried over the piers.
Setting on the pier The crews guide the span as it is lowered onto the pier head.

The site in pictures

10 photos

Have a similar project?

Talk to the experts